technifyed

Statistics and Probability · Data Analysis

Predict cricket scores with a simple model

Use the score at 10 overs to predict the final total and measure how wrong you are.

  • DifficultyIntermediate
  • Estimated time1–2 weeks
  • Budget₹0
  • ClassClass 11 to college
  • TeamSolo or up to 2
  • You needComputer only

Prerequisites: None beyond your class work

Original · by TechnifyedData AnalysisPortfolio ProjectFree to doComputer onlyResearch orientedPortfolio focused

My projects

Overview

Use the score at 10 overs to predict the final total and measure how wrong you are.

Skills you will use

Evaluating predictionsRegression

Materials and tools

  • Public scorecards for at least 100 limited-overs innings
  • Spreadsheet

Tools and software

Spreadsheet

Expected cost₹0Nothing to buy
Estimated duration1–2 weeks5 build steps, plus the report

Step-by-step roadmap

  1. Start

    You will finish with: a prediction formula and its average error on unseen matches.

  2. 1

    Prerequisites

    Nothing special to know first. Then collect the 2 items in the materials list.

  3. 2

    Learn

    Read up on data analysis: public-data, regression, sports. Your textbook chapter and one short video are enough.

  4. 3

    Plan

    Write the research question, who or what you will study, how many, and the exact questions or measures.

  5. 4

    Build

    1. Collect the score and wickets at 10 overs and the final score.
    2. Plot final score against the 10-over score.
    3. Fit a line.
    4. Add wickets lost as a second factor.
    5. Test on 20 innings you held back.
  6. 5

    Test

    Check a sample of your data by hand, and ask whether another explanation fits your findings equally well.

  7. 6

    Document

    Keep the raw responses or data safe, anonymise names, and build the tables and charts. Report structure

  8. 7

    Present

    State the question, the method in one line, the two or three main findings and their limits. Presentation structure

  9. 8

    Publish

    Share a short paper or poster; offer a summary to the people who took part.

Expected outcome

A prediction formula and its average error on unseen matches.

Other versions of this project

Advanced version

Compare your model with the simple run-rate projection shown on TV.

Ways to do this project

Text marked "You write this" is a prompt for your own work; everything else is specific to this project.

Research question
You write thisOne question you can answer with data, narrow enough to finish in the time you have.
Hypothesis
You write thisWhat you expect to find, and why.
Variables
You write thisWhat you change or compare, what you measure, and what you hold constant.
Methodology
You write thisDescribe the method in enough detail that someone else could repeat it: sample, tools, procedure.
Data collection
You write thisSay what you will record, how many times, and how you will keep the records safe.
Analysis
You write thisChoose the table, chart or test that answers the question; report averages with their spread.
Limitations
You write thisList what could have affected the result: small sample, instrument limits, things you could not control.

Literature review

Find five to eight sources (your textbook, review articles, reports) and note what each says about your question. Group them by idea, not one after another, and end with what is still not known.

References

List every source you used in one style throughout (author, year, title, where it was published, link and the date you opened it).

Working as a team

Solo or up to 2. Suggested roles:

Research and readingData collectionAnalysisWritingPresentation

Report and presentation

Report structure

  1. Title
  2. Abstract
  3. Introduction and research question
  4. Review of what is already known
  5. Method: sample, tools, procedure
  6. Findings (tables and charts)
  7. Discussion
  8. Limitations
  9. Conclusion and suggestions
  10. References
  11. Annexure: questionnaire or data

Presentation structure

  1. Research question
  2. Why it matters
  3. Method and sample
  4. Finding 1
  5. Finding 2
  6. Finding 3
  7. What it means
  8. Limitations
  9. Conclusion

Viva questions

Prepare your own answers to these before you present.

  • What is the aim of your project, in one sentence?
  • What is the principle behind it?
  • Why did you choose these materials or tools?
  • What result did you get, and was it what you expected?
  • What went wrong and how did you fix it?
  • How could this be improved or used in real life?

Resources

Source and attribution

Original

Written by Technifyed. Free to use for your own school or college project; write the report in your own words. Added 1 Oct 2026.

Similar projects

More Statistics and Probability projects

Statistics and Probability + Media and Journalism

Use statistics to check a newspaper claim

Pick five statistical claims from the news, find the original data and judge each.

  • Intermediate
  • 1–2 weeks
  • Free
Data Analysis · Computer onlyView

Same tools

Accountancy · Ratio Analysis

Analyse the annual report of a listed company

Compute liquidity, profitability and solvency ratios for a company over five years and explain the trends.

  • Intermediate
  • 1–2 weeks
  • Free
Finance Project · Computer onlyView

Applied Mathematics + Sociology

Model the spread of a rumour

Build a logistic model of how a rumour spreads through a school and test it with a class game.

  • Intermediate
  • 1–2 weeks
  • Free
Simulation · Computer onlyView

Macroeconomics · Growth

Analyse your country's growth over 30 years

Chart GDP growth, sector shares and income per person, and explain three turning points.

  • Intermediate
  • 1–2 weeks
  • Free
Data Analysis · Computer onlyView

Two-subject alternatives

Data + Statistics and Probability

Analyse cricket data to test a common belief

Use ball-by-ball public data to test a claim such as "winning the toss wins the match".

  • Intermediate
  • 1–2 weeks
  • Free
Data Analysis · Computer onlyView

Artificial Intelligence + Statistics and Probability

Predict house prices with linear regression

Use a public housing dataset to predict price from size, rooms and location.

  • Intermediate
  • 2–7 days
  • Free
AI/ML Project · Computer onlyView

Behavioural and Cognitive Science + Statistics and Probability

Study how people estimate risk

Ask people to rank causes of death or accidents and compare their ranking with official figures.

  • Intermediate
  • 2–7 days
  • Free
Survey · No equipmentView

Same difficulty and budget

Applied Mathematics · Simulation

Simulate a queue at a bank or canteen

Measure real arrival and service times and simulate how the queue changes with one more counter.

  • Intermediate
  • 1–2 weeks
  • Free
Simulation · Computer onlyView

Applied Mathematics + Political Science

Investigate voting systems with mathematics

Collect ranked preferences from your class and show that different voting rules pick different winners.

  • Intermediate
  • 1–2 weeks
  • Free
Investigation · No equipmentView

Applied Mathematics + Geography

Model population growth of your town

Fit exponential and logistic models to census data and forecast the next count.

  • Intermediate
  • 1–2 weeks
  • Free
Data Analysis · Computer onlyView

Applied Mathematics + Behavioural Economics

Analyse a simple game with game theory

Play repeated prisoner's dilemma with classmates and compare what they do with the theory.

  • Intermediate
  • 2–7 days
  • Free
Investigation · No equipmentView

Enter your email and the official page opens. Phone is optional.