Industrial and Manufacturing · Quality
Apply 5S to a workshop or lab
Reorganise a lab or workshop using the 5S method and measure the time saved finding tools.
- Easy
- 1–2 weeks
- Under 250
606 projects · 13 streams · every class
Process improvement, layout, quality and manufacturing projects based on real observation and data.
2 Industrial and Manufacturing projects
Industrial and Manufacturing · Quality
Reorganise a lab or workshop using the 5S method and measure the time saved finding tools.
Industrial and Manufacturing + Graphic and UI/UX Design
Measure classmates and their desks, find the mismatch and design a desk that fits.
0 to compare
Compare