Industrial and Manufacturing · Quality
Apply 5S to a workshop or lab
Reorganise a lab or workshop using the 5S method and measure the time saved finding tools.
- Easy
- 1–2 weeks
- Under 250
606 projects · 13 streams · every class
Design, build and test projects for every engineering branch, from mini projects to final-year capstones, with low-cost versions where possible.
1 Engineering project
Industrial and Manufacturing · Quality
Reorganise a lab or workshop using the 5S method and measure the time saved finding tools.
0 to compare
Compare